Preparation for and subsequent beachpull, tow out and installation (upending and docking) of a 1200 m long Riser Bundle for GIRASSOL extention ROSA field.
Tasks:
Procedures set up
Hazids
Preparations for the beach pull and tow out
Tow to field and positioning cum upending and docking operations next to GIRASSOL FPSO
Vessel audits and inspections
Projects
HRB Nautique: Sint Jacobsplein 69, 3311 CV Dordrecht, The Netherlands